Feb. 26th, 2013

niall_shapero: Fox Mask (Foxmask)
The workers are between a third and a half done. The upstairs bathroom is currently unusable, and the downstairs bathroom is only partially usable (the toilet works, thank heavens). They haven't been bad - though one of them managed to trip the circuit breakers by not paying careful attention to the loads they had already put on the electrical system. But it is a terrible pain in the posterior, and trying to get work done at the same time is almost impossible.

Meanwhile, I have been reduced to sponge baths for some five days, and I am getting ROYALLY sick of it. With luck, the shower should be available again Real Soon Now...

Profile

niall_shapero: Fox Mask (Default)
niall_shapero

September 2017

S M T W T F S
     12
345678 9
10111213141516
17181920212223
24252627282930

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Sep. 25th, 2017 02:59 pm
Powered by Dreamwidth Studios