House repairs
Feb. 26th, 2013 05:23 pmThe workers are between a third and a half done. The upstairs bathroom is currently unusable, and the downstairs bathroom is only partially usable (the toilet works, thank heavens). They haven't been bad - though one of them managed to trip the circuit breakers by not paying careful attention to the loads they had already put on the electrical system. But it is a terrible pain in the posterior, and trying to get work done at the same time is almost impossible.
Meanwhile, I have been reduced to sponge baths for some five days, and I am getting ROYALLY sick of it. With luck, the shower should be available again Real Soon Now...
Meanwhile, I have been reduced to sponge baths for some five days, and I am getting ROYALLY sick of it. With luck, the shower should be available again Real Soon Now...